Technician using a tablet beside concrete testing equipment on a construction site.

Concrete and geotechnical reporting

Field data.
Simply done.

Capture field measurements by voice. Follow samples through the lab. Keep everyone on the same page, from field to project close-out.

Contact us

Speak, correct, read back.

Voice assistance within your field report.

Follow the same sample.

Field records, cylinder schedules, and lab results.

See the project story.

A dated diary and project summaries for the PM.

From field to office

One record.
Connected through
the job.

Your field measurements, sample history, and project activity — together in one workflow.

fildiHarbourview ResidencesAD
Project diaryField reportsSamplesLab results
PROJECT DIARY

The whole job, in view.

Concrete · Level 02 slab

Set 014 · 6 cylinders cast

85 mm slump6.2% air
28-day lab results

014-B · 35.3 MPa   014-C · 36.3 MPa

Geotechnical reports

Density tests · Borehole BH-12

9:41 ••• ▰

Concrete inspection

Slump 85, air 6.2,
temperature 22.4.
Six cylinders.
Got it. Your readings
are in the report.
Slump85 mmAir content6.2%Concrete temp.22.4 °C
+ Message Fildi…
Illustrative interface · Demo data

See the connected workflow

From the first measurement
to the project diary.